The design automation of engineering systems of the training center
Details under the cut ..
DESIGNING THE AUTOMATION OF ENGINEERING SYSTEMS
The baseline data for the development of the project were:
- technical task;
- technical conditions for connection of the allocated capacity;
- architectural and construction drawings.
The project was developed in accordance with:
- GOST R 53246-2008 “Information Technologies. Cable systems structured. Designing the main components of the system. General requirements"
- ISO / IEC IS 11801-2002 “Information Technology. Generic cabling for customer premises (international standard) »
- GOST 21 101-97 "System of project documentation for construction";
- PUE “Rules for electrical installations" 6th and 7th edition ";
and other applicable regulatory documents of the Russian Federation (SNiPs, GOSTs, SP, Federal Laws, etc.).
1. Patent clearance
This documentation does not contain information and does not apply technological processes, technical solutions, equipment, devices, structures, materials and products that violate patent purity.
2. Intellectual property
Intellectual property on this set of drawings belongs to the Customer.
3. Installation instructions
All work on the installation and installation of equipment, laying and installation of cable lines in accordance with these drawings and the requirements of regulatory documents listed in the "Statements of reference and attached documents."
The legend is shown in the drawings.
PROJECT DOCUMENTATION ASDU
Drawings in AutoCAD .dwg format can be downloaded from the links:
Automation block diagram
Basement plan
Ventilation chamber plan
plan
plan 2 floor
circuit board automation
automation cabinet layout
automation shield
schematic diagram for the assembly of automation and dispatch cabinets