PREMISES FIT-OUT WORKS

PREMISES FIT-OUT WORKS

INTRODUCTION

During the period of fit-out works the Tenants can address all their organizational and technical questions to the Tenant Coordination Team as specified in 1.2 of this Handbook.

In order to start fit-out works in the Premises the Tenant shall ensure that the design and method of fit-out work in the premises leased by it in all aspects and in reasonable detail comply with all regulations and technical standards applied in the design of the Shopping Center.

Read more: PREMISES FIT-OUT WORKS

More Articles ...

  1. Design of cold supply for IT rooms in the office center
  2. HEATING. Design of the heating system
  3. VENTILATION. Design engineering systems HVAC
  4. Design of ventilation of residential complex
  5. Design of the ventilation system HVAC in a photo studio
  6. Design of heating the dining room of the sport complex
  7. Design of heating and ventilation HVAC for landing stage
  8. The design of heat supply of the laboratory building of the university
  9. Design of heating of ventilation and air conditioning for laboratory building
  10. Heating point automation design for scientific research institutes
  11. AHU algorithm. The act of transition to winter mode
  12. Technical task of the technical assignment for the modernization of ventilation in scientific research institutes
  13. Ventilation service REGULATION. Scientific research institute
  14. Design of climate AHU for laboratory
  15. The design of ventilation HVAC production complex
  16. Technical task of a gas boiler room for a warehouse complex
  17. Design of ventilation HVAC training center
  18. Heating and ventilation design for Checkpoint
  19. Design of ventilation of smoke removal of the Business Center
  20. The design of heat supply and heating
  21. Design of the system of air ventilation for the conference hall
  22. Design of chiller center for office building
  23. Design of the refrigeration center automation for several office buildings
  24. Design of the air-conditioning system in the Business Center
  25. Drawings of the working documentation of the heating system in the office building
  26. Design of the Cooling Supply System for the hospital building
  27. Project (design) documentation of the heat supply system for Polyclinic
  28. Design of ventilation facility fitness center