Building Sewage System Design Project
Our organization has completed the design of the sewage and drainage section for a multifunctional building.

Design examples
SEVERTORG
Our organization has completed the design of the sewage and drainage section for a multifunctional building.

The work performed by the Landlord is related to construction of the Mall building or Premises. Basically, it is limited to shell and core with performance of minimal fit-out.
The work performed by the Landlord for the leased Premises may differ and depends on conditions indicated in the Lease Agreement signed.

The Landlord shall be responsible for the general design of the Mall the Premises are located in. The Mall is constructed in accordance with the requirements of СНиП and other requirements regulating construction activity in the place of, and during, construction. All construction materials, materials for internal and external fit-out of public premises and colors are chosen by the Landlord as it thinks fit.
Read more: INFORMATION ON STRUCTURES AND ENGINEERING SYSTEMS OF SHOPPING MALL
Shop drawings of water-supply system has been made.

Shop drawings of ventilation and air conditioning system has been made.

Shop drawings of cooling and heating system has been made.

Shop drawings of an sprinkler system has been made.

Read more: Shop documentation of the automation sprinkler system
Has been made storm drainage project of an education center.

Has been made natural gas distribution project of an education center.

Has been made sanitary sewerage project of an education center.

Has been made water distribution project of an education center.

Our company developed design water supply and sewage system of Hotel complex.

Read more: Engineering sanitary watersupply and sewage of Hotel complex