Drawings of the working documentation of the heating system in the office building
According to the drawings of the Working documentation developed by us, we finished installation of the heating system in the office building of the Business (Business) center. Made heating in the office of the tenant. Performed the NDP and the delivery of work to the customer's technical supervision. The management company for a long time could not provide the normal parameters of the coolant in the heating system, and therefore had to face a number of problems and delays.

DESIGNING OF HEATING
The project of heating, ventilation and air conditioning of the object (see paragraph 1.1.) Is made in accordance with the original
data (see clause 2.1.) and in accordance with the rules and regulations in force in the territory of the Russian Federation:
- GOST 21.602-2003 Rules for the execution of working documentation of heating, ventilation and air conditioning.
- GOST 30494-2011 Residential and public buildings. The parameters of the microclimate in the premises.
- SP 118.13330.2012 Public buildings and facilities.
- SP 131.13330.2012 Construction climatology.
- SP 60.13330.2012 Heating, ventilation and air conditioning.
- SP 73.13330.2012 Internal sanitary systems.
- SanPiN 2.2.4.548-96 Hygienic requirements for the microclimate of industrial premises.
- SP 7.13130.2013 Heating, ventilation and air conditioning. Fire requirements.
- Federal Law 123-FZ of 07/22/2008 Technical regulations on fire safety requirements.
3. MAIN SOLUTIONS FOR HEATING.
3.1. Space heating is provided by a central water heating system. Heat carrier system
heating - water with temperature parameters according to the schedule of the heat supplying organization.
3.2. The heating system is double-pipe riser with separate horizontal floor-by-floor branches. Vertical
the risers of the heating system are laid in the mines or technical premises of steel water and gas pipelines
pipes with a diameter of up to 50 mm and seamless steel pipes for diameters of 65 mm and more.
3.3. On the risers and distribution floor branches of the heating system installation is provided
disconnecting, regulating and drain fittings. Air removal is provided through air taps
heaters and air vent in the highest points of the risers.
3.4. Steel radiators of the company are provided as space heaters in the premises.
"Korado", regulation of the heat transfer of heating devices is carried out using thermostats.
3.5. All used equipment must withstand a working direction in the system of at least 10 bar.
3.6. The project marks the AR provided for the location of heating devices under the windows.
3.7. The pipelines of the heating system are hidden hidden in the construction of floors made of polyethylene pipes with
anti-diffusion protection type PE-Xa company "Rehau", in a protective corrugated pipe. Linear compensation
horizontal wiring extensions are not provided. In places of folding connections of pipelines and
fittings provided for the presence of removable elements of the floor or walls.