Fire alarm design drawings for checkpoint

our engineering organization has completed the development of design documentation for stage P and installed the automatic fire alarm system of the automatic fire alarm system at the checkpoint.

Fire alarm design drawings for checkpoint

DESIGNING OF AUTOMATIC FIRE ALARM SYSTEM FAS

The working documentation has been developed in accordance with the existing construction, technological and sanitary norms and rules, provides for measures ensuring constructive reliability, fire and explosion safety of the facility, protection of the population and stable operation of the facility in emergency situations, protection of the environment during its operation Code of the Russian Federation.

Works that affect the safety of the building are absent. Before making holes in the walls and ceilings, make sure that there are no engineering communications and supporting structures at the drilling sites.

Working documentation hidden works is not provided.

Install optical smoke detectors (detector edge) at a distance of at least 0.5 m from lighting devices (lighting device edge) and 1.0 m from ventilation openings.

The APS cable lines should be laid at a distance of at least 0.5 m from the power and lighting cable lines. Laying of cable lines APS and lines of power supply to control devices to perform in different compartments of electrical boxes.

Cable routes to be fixed in increments of not more than 0.5 m.


Cutting cables to produce after the control measurement of the laying of routes with regard to the margin on the cutting of the ends of the cables. The type and length of cables used are indicated in the cable log.

Before performing installation work, conduct input control of installed products. It is not allowed to install technical equipment with detected defects. Installation should be carried out in accordance with the technical data sheets for the products, guided by the reference book of engineering and technical workers and electricians of the 78.36.001-99.

PROJECT DOCUMENTATION OF FIRE ALARM

Before connecting the power supply, the reliability of all grounding devices must be checked.

After completion of all installation and adjustment work, employees are required to clean the workplace from building waste and debris generated during the work.

Deviations from the working documentation during installation are not allowed without the consent of the design organization developer. It is not allowed to replace some technical equipment with others having similar technical and operational characteristics, without coordination with the project organization.

Installation of electrical equipment must be carried out in accordance with the requirements of EMP, SNiP 3.05.06-85. By production of installation works the safety measures according to Construction Norms and Regulations 12-03-2001 and Construction Norms and Regulations 12-04-2002 shall be provided.

To protect against electric shock, all metal parts of electrical installations that are not normally energized should be grounded. Protective and working grounding should be performed in accordance with the Technical Description and Instructions Manual.

When installing, you should also be guided by the sections on safety of technical documentation of manufacturers, departmental guidelines on safety during installation.

Power tools and hand-held electric machines must meet the requirements of current standards and undergo periodic inspection. Ensuring safe working conditions, fire and explosion safety and environmental protection during work must be carried out in compliance with the requirements of the Occupational Health Standards System, the relevant regulatory documents of the Gosgortekhnadzor on these issues.