Designing of architectural solutions finishes for an checkpoint
Our design company has elaborated a technical design documentation and decoration of the checkpoint building according to the working documentation of the architecture fit-out.

Architectural solutions designing
Project architecture
General guidelines of the project architecture. The basis for the development of the working documentation of the reorganization is the agreed project and the technical task approved by the customer. For the relative mark of 0.000 (G1.1), the mark of the clean floor at the entrance to the building was taken equal to the absolute mark of 125.32. All absolute marks are given in the Baltic coordinate system. The degree of fire resistance of buildings - IV; Class of functional fire hazard of buildings - FZ; Constructive fire hazard class - CO; Fire hazard class - KO. The album presents architectural solutions for the building, including solutions for interior and exterior decoration. Consider together with albums of the Kyrgyz Republic, engineering and technological sections of the project. The floor structure should be filled with a polyurethane finishing layer of 3mm (BASF MasterTop BC 375 N or equivalent). Primer BASF MasterTop P617 or equivalent. Coupler to take class B25 on a small filler, with the addition of fiberglass (Fibrofor Hight Grade or equivalent). Apply ISOMAT Adiplast primer or equivalent on the slab. Provide a device for temperature-shrinkage joints in the floor screed by cutting off walls with a porous cable and Sikaflex 15 LM RAL 7021 sealant (identical to the self-leveling floor). Provide for the installation of technological fines, hatches and a dirt-protective grille.
Roof
The construction of the roof should be performed in accordance with the “Guidelines for the Design and Installation of Single-Layer Roofs of Polymeric Membranes of TechnoNIKOL Corporation, 4th edition 2014” and the “Guidelines for the Design and Installation of Roofs of Bituminous-Polymer Materials of the Roofing Company TechnoNIKOL”. On the stained glass windows, windows, swing and sliding doors from the outside install a film of protection class A2. The pitch of the frame of the aquapanel frame should be laid 400 mm, with the exception of the switchboard, where it is reduced to 300 mm (for more reliable fastening of the guards). Mount the partition walls, taking into account the reinforcements for the doors and communications passages, from the clean floor and bring the roof covering to the bottom and fix it through the adapter plate 1 = 2mm, fill the gaps with NG mounting foam. After completion of the installation of engineering equipment, in accordance with the approved project for the production of works, install cement aquapanels on the LSTC partition wall.
Vertical fastening of partitions to produce according to the nodes developed by KNAUF. When carrying out work, comply with the requirements of SP 70.13330.2012 "Bearing and enclosing structures. Updated edition of SNiP 3.03.01-87". Installation units of doors, windows and stained-glass windows to perform according to the drawings of KMD manufacturers. Before making all products to perform measurements in place. Section KMD coordinate with the developers of Azerbaijan. The junction of door blocks must comply with GOST 30971-2002. When building a building in winter conditions, screed and masonry work to be performed using mortars with antifreeze additives.
Documentation
Customized specifications are carried out by the contracting company and necessarily agreed with the customer and the authors of the project. To provide for the device of thermal curtains over the sliding doors. Exterior walls - 120 mm sandwich panels on a metal frame with aluminum lining on the aluminum subsystem with fastening to the external metal framework. All metal structures are painted with enamel KO-174 in 2 layers. Fastening and connecting sandwich panels to supporting structures should be performed according to the nodes and technology of the manufacturer.