Design access control of hotel rooms

Our company made design engineering of system access control of hotel rooms.

design engineering access

General instructions Access

Working documentation complies with the following documents:

  • - project documentation;
  • - project task;
  • - architectural plans.

The designed section complies with the regulatory documents as follows:

  • -Engineering recommendations & minimum standartds v. 4.0, international technical services, inc.
  • - GOST R 51241-2008 Tools and systems for access control. Classification. General technical requirements. test Methods;
  • - R 78.145-93 Systems and systems security, fire and fire alarm systems. Rules of production and acceptance of work;
  • - GOST R 21.1101-2009 "System of design documents for construction.

Basic requirements for the design and working documents";

- PUE "Rules for Electrical".

2. Access control of hotel rooms (ACHR). is part of Security system. ACHR is designed to restrict access to certain areas and admission to the organization.
ACHR is based on hardware firm Vingcard.

3. Working documentation provided to install peripheral equipment according to the plans to deploy the equipment.


The full composition of the product is given in the specification of this chapter.

4. The central equipment is server with software Messenger. The server placed on floor the Building.

5. Equipment is connected to a dedicated network of integrated information security system. Information Network organized by the project according.

6. Power supply of equipment organized by the project according by

7. Installation of equipment to perform in accordance with the accompanying drawings, diagrams, technical documentation, and manufacturer's instructions for installing. Allowed refinement of the location of the equipment in place, in accordance with the instructions for installation of devices. Installation and commissioning must be carried out by a specialized organization, which has a license.

8. Work on the installation of equipment to perform in compliance with the safety measures and safety. Construction and installation work must be performed by an organization that has a license to perform these types of jobs.

9. System must be in compliance with safety regulations, technical documentation, operational documents for the product.

10. Select models of the equipment in the specification can be adjusted at the time of installation works.

Russian version prevail.