Working drawings Automated parking system (APS)

Our company has elaborated working drawings for Automated parking system (APS) at Moscow.

wd working drawings parking

Working documentation SAP

  • project documentation;
  • project task;
  • architectural plans.

The designed section complies with the regulatory documents as follows:

  • GOST R 51241-2008 Tools and systems for access control. Classification. General technical requirements. test Methods;
  • R 78.145-93 Systems and systems security, fire and fire alarm systems. Rules of production and acceptance of work;
  • GOST R 21.1101-2009 "System of design documents for construction.

Basic requirements for the design and working documents";

- PUE "Rules for Electrical".


2. Automated parking system (APS) is part of the technical security complex object. APS is designed to organize and control entry and exit of vehicles to the underground parking towers 1 and 2 and commercial zone, collect payments for services rendered, as well as to provide service functions and the safety of customers.

Automated parking system built on the equipment ISD. Audio communication between the entry and exit control terminals and posts directions made by the built-in network intercom.

3. Working documentation provided to install:
- Central equipment (server hardware, workstations administrator and operator terminal coding tickets set of specialized software);

- Peripheral equipment (entry and exit terminals, parking terminals, payment terminals, barriers) under plans to deploy equipment;

- Control equipment of cars (car detector, light boards).

The full composition of the equipment is given in the specification of this album.

4. APS equipment is connected to a dedicated network of integrated information security system.

5. Power of APS equipment is on Task for power supply.

6. Installation of equipment to perform in accordance with the accompanying drawings, diagrams, technical documentation, and manufacturer's instructions for installing. Allowed refinement of the location of the equipment in place, in accordance with the instructions for installation of devices. Installation and commissioning must be carried out by a specialized organization, which has a license.

7. Work on the installation of equipment to perform in compliance with the safety measures and safety. Construction and installation work must be performed by an organization that has a license to perform these types of jobs.

8. System must be in compliance with safety regulations, technical documentation, operational documents for the product.