Design of transformer station Power distribution point pig farm

Our design organization has completed the design and installation of a transformer substation package transformer substation for power supply of a pig farm.

details below ..

 

DESIGNING POWER SUPPLY. POWER POINT

Download projects in dwg avtokade:

KTP one-line diagram

1. The project was completed on the basis of the technical specifications and in accordance with the requirements of SP31-110-2003, PUE, GOST R50571.

2. Technical solutions adopted in this set of working drawings comply with the requirements of environmental, sanitary and hygienic, fire-fighting and other standards in force in the territory of the Russian Federation, and ensure the safe operation of the facility while observing the measures provided for in the working drawings.

3. The project provides for the installation of a complete transformer substation KTPNt-400/10 / 0.4-U1.

4. The projected KTPNt 400 kVA is connected to the projected 10 kV overhead line, which is carried out according to a separate project.

DESIGN DOCUMENTATION OF KTP TRANSFORMER SUBSTATION

5. Around the substation to make a ground loop of steel strip 5x40 mm and angle of steel 63x63x6 mm, Rз <4 Ohms.

6. Back-up power supply is provided from a diesel generator set R440E1, located next to the package transformer substation. Connect the diesel generator set to the KTP grounding circuit with a steel strip of 5x40 mm.

7. The project provides for reactive power compensation.