PROJECT OF CABLE DRAINAGE IN THE TERRITORY
Install clusters in place. Layered thrombosis every 50 mm. Then restored the top layer of pavement.
The volume of work on the 1st of the cluster.
1 Dredging for pipeline
m3 1404.83
2 Laying 2-hole cable duct connection
rm 1988.70
3 Laying of 3-hole cable duct connection
rm 150.15
4 Report of single-port telephone conduit
rm 56.20
5 Backfilling trenches with sand
m3 1037.16
6 Backfilling of trenches with sand and gravel
m3 437.91
7 Dredging for the pit
m3 150.15
8 Installation of a cable connection well (type SmKKS-2-80)
PC. 25.00
9 Installation of a cable connection well (type ККСр-1-10 (80) ГЕКон)
PC. 8.00
10 Backfilling with sand
m3 54.45
11 Backfilling with sand and gravel
m3 23.10
12 Organization of building entry
PC. 3.00
13 Organization of input to the adjacent network
PC. 6.00
14 Organization of entry into the telecommunications cabinet
PC. 12.00
15 Opening asphalt cover for trenches
rm 1057.35
sixteen
Opening asphalt pavement for communication cable wells
(type KKSR-1-10 (80) GEKON)
m2 19.44
17 Restoration of asphalt trenching
rm
352.45
18 Restoration of asphalt covering of the cable connection well.
m2
6.48
19 Backfilling of soil trenches m3 4675.17
20 Backfilling the ground of a cable connection well
m3
10.50